Sitework Project

Troutman Detention

Ike’s Construction was the prime contractor on this project.  We installed a new underground detention system consisting of five 160 ft runs of 96” Corrugated Metal Pipe for storm water storage, an 8 ft x 11 ft Storm Filter Precast Unit with twenty-six 27” perlite cartridges for the water quality unit all designed by Contech Engineered Solutions.  Ike’s Construction removed approximately 3,600 CY of dirt from the site.  We installed approximately 2,300 tons of #57 Stone around the detention system.

Image